RISK ASSESSMENTS & METHOD STATEMENTS
To ensure that the risk of hazard is minimised for all the various tasks we carry out, Risk Assessments have been made and from them Method Statements have been written to provide guidance to our volunteers. Personal Protection Equipment (PPE) is available at the Mill to suit the needs of any task and volunteers are briefed on the risk assessment and the whereabouts of PPE.
COSHH Assessments for products we use at the Mill are available HERE.
This page lists the Method Statements
Click HERE for RISK ASSESSMENTS
Method Statements | |||
Ref# | Title | Version | Download |
MS00 | Introduction to Safety Management System | Update needed | |
MS01 | Blacksmiths' Forge | 3 | |
MS02 | Operation of Line Shaft Driveen Bandsaw | 4 | |
MS03 | Barn Engines and Equipment | 3 | |
MS04 | Beam Engine Operation and Maintenance | 7 | |
MS05 | Historic Clocks | 3 | |
MS06 | External Displays and Picnic Area | 3 | |
MS07A | Oil-Fired Boiler - Operation | 4 | |
MS07B | Oil-Fired Boiler - Annual Maintenance | 2 | |
MS08 | Small Steam Engines | 5 | |
MS09 | Upper Floor General | 3 | |
MS10 | Waterwheel and Gear Rooms | 4 | |
MS11 | Wood Turning | 3 | |
MS12 | Lone Working | 5 | |
MS13 | Riverside Tearoom | 1 | |
MS14 | Beam Engine Signalling | 1 | |
MS15 | Oiling of Line Shafting etc | 2 | |
MS16 | Working at Height, Handling Hazardous Materials and Heavy Lifting | 1 | |
MS17 | Use of MAchinery and Hand Tools | 1 | |
MS17 Annex | Approved MAchine Tools | 1 | |
MS18 | Operation of Line Shaft Electric Motor | 1 |